Highlights:

Project:  1W Parking North Express Expansion
Client:  DFW International Airport
Architect:  DFW International Airport
Note:  Completed in 75 days

This expansion project spread over a 5 acre site and included: concrete paving, asphalt paving, fire-line construction, storm drain, grading, signage, demolition, erosion control, utility adjustments, pre-engineered canopies and foundations. Coordination was imperative during this project. Prior to demolition, we were responsible for relocating the existing vehicles in the parking lot, recording the relocation process and all owner notifications. Both pedestrian and vehicle traffic was controlled throughout the duration of the project. DFW’s recycle and resale facility was utilized for all applicable materials. Also included was the sprinkler system redesign and the striping and numbering of all parking spaces.

This particular project was a high profile project for DFW Airport due to the short time line and the holiday revenue they stood to gain from a successful on-time completion. The 90 day time line which was subsequently shorted by a 15 day delay while awaiting the abatement completion and the airport permit process was not a problem for J.C. Commercial. The owner requested additional work which included a motorcycle parking area modification at a separate location and the addition of a new bus entrance/exiting area to parking. The expansion was completed on-time and allowed for the day to day operation of the airport’s facilities to continue uninterrupted.