Highlights:
Project: Love Field Snow & Ice Removal Facility
Client: City of Dallas
Architect: PGAL
Note: LEED Silver Certified
Developed to house the necessary snow and ice removal equipment required by the Airport. The overall facility is approximately 53,836 square feet and consisted of the construction a two pre-engineered metal buildings with standing seam roof. The maintenance facility for the equipment occupied 29,103 square feet and the remaining 7,733 square feet incorporated administrative offices, conference room, training rooms, copy/file area with break room, lockers and restrooms. A secondary structure was built for parking and storage of additional equipment. This is a 17,000 square foot open air facility with a standing seam metal roof. The buildings are surrounded by 30,000 square feet of 5” concrete paving. All buildings are fire sprinkled, fire alarmed and meet the current energy codes and handicap requirements.